Metro Match Dollars at Work

Phase I Update

Including the ASP Test Bins and Phase I Module, we have completed 119 batches, approximately 58,000 cubic yards, with ASP composting. Average oxygen readings have been at 18.2%.

Phase II Update

With the Metro Match Funds from the Innovation and Investment Grants program, we have installed the blower and manifold units for the Phase II module. In addition, we are in the process of installing the lateral air manifolds and sparger tips to provide aeration to the next 8 composting zones. The concrete pour is scheduled for July 2020.